District wide LED Lighting (Except Middle School, Currently LED)
Total fixtures retrofitted = 4,480
High School HVAC
• Install two new 300-ton chillers, replace CHW pumps
• Replace 16 AHUs on roof (convert 3 to DX heat pump)
• Replace 101 VAV boxes
• Install ALC Building Automation System
1. Schedule HVAC equipment (Chillers + AHUs + VAV + Exhaust Fans)
2. Monitor and Control space temperature and humidity
Elementary School HVAC
• Install two new 200-ton chillers
• Repair 11 AHUs (dampers and coils)
• Replace 68 VAV boxes
• Install ALC Building Automation System
1. Schedule HVAC equipment (Chillers + AHUs + VAV + Exhaust Fans)
2. Monitor and Control space temperature and humidity
Network Based Stats
• Old Junior High School
• Maintenance / Transportation
Retro-commissioning
• Existing Control System @ new Middle School
Building Envelope Improvements
• Elementary School
• High School
• Administration Office
• Old Junior High School
K-12
HVAC, Controls, Roofing, LED Retrofit
$2,230,070