Energy Efficiency & Facility Upgrade

ROYAL ISD

Royal ISD hired E3 to undertake a district-wide energy efficiency and facility upgrade project. Royal ISD was facing many of the same problems that other districts face; high energy bills, constant problems with their energy management controls, chillers malfunctioning and widespread comfort complaints. Together E3 and Royal ISD crafted a plan that would address each one of these issues while saving the district’s precious M&O dollars in the process.

The following projects were initiated to solve the issues:

  • 7 new chillers throughout the district
  • Chiller plant redesign and replacement
  • RTU and DOAS redesign and replacement
  • AHU Replacement
  • District-wide LED retrofit
  • Installation and expansion of the Building Automation System
  • Replace control valves and dampers throughout the district
  • Surge Protection
  • Uninterruptible Power Supply (UPS) installation

The result of the project was dramatically reduced utility bills, fewer comfort complaints and maintenance calls, and a huge swipe out of their deferred maintenance. Additionally, this project will result in rebate incentives from Centerpoint Energy.

CONTRUCTION HIGHLIGHTS